American River Canyon Drive Surface Drainage Project (101)
| N |
| <all other values> |
Pavement_Resurfacing_23_24 (98)
| N |
| <all other values> |
Pavement_Resurfacing_22_23 (95)
| N |
| <all other values> |
Pavement_Resurfacing_21_22 (92)
| N |
| <all other values> |
Rainbow Bridge Maintenance Project (89)
| N |
| <all other values> |
Folsom Lake Crossing (86)
| N |
| <all other values> |
Empire Ranch Interchange (83)
| N |
| <all other values> |
Historic District Connectivity Project (80)
| N |
| <all other values> |
Capital Connector JPA line (77)
| N |
| <all other values> |
Folsom Lake Crossing and East Natoma Street Traffic Safety Enhancement Project (74)
| N |
| <all other values> |
E_Bidwell_Iron_Point_50WB_Intersection (71)
|